Cupped hardwood near a dishwasher led to mitigation in both the kitchen and crawl space. Encore removed affected materials, monitored structural drying and completed the mitigation walkthrough. Reconstruction remains in progress.
A leaking toilet supply line affected the upstairs bathroom floor and the home office ceiling below. Encore removed damaged materials, monitored drying and coordinated the transition to reconstruction.
Buckling flooring led to an inspection that found moisture across several rooms and the crawlspace. Encore removed damaged materials and wet insulation, established containment and adjusted drying equipment as follow-up readings identified damp areas.
A leaking water heater in a neighboring unit caused damage across several rooms. Encore removed wet materials, adjusted drying equipment as moisture persisted and moved the project into reconstruction.
Water from a third-floor shower spread into the kitchen, hallway, bathroom and basement. Encore opened affected materials, installed drying equipment and completed the documented mitigation phase before reconstruction planning.
A burst pipe caused water damage across multiple rooms. Encore completed extraction, drying and reconstruction, with the project closed out in October.
A dishwasher leak damaged the kitchen and adjoining rooms. Encore completed drying, contents handling and reconstruction, including new flooring and kitchen finishes.
An upstairs bathtub overflow affected the bathroom, bedroom, closet and downstairs ceilings. Encore completed mitigation, structural drying and reconstruction, followed by a walkthrough of the repaired rooms.